Our Investments

HYDROELECTRIC

Tonya Hydroelectric Power Plant

Installed Power 12.4MW
Location Tonya, Giresun
Operating Year 2021
Carbon Saved ~22.000 Ton/Yıl
Tonya Hydroelectric Power Plant

Tonya Hydroelectric Power Plant About

Tonya Hydroelectric Power Plant in Giresun, which was commissioned in 2021, is one of the important projects that strengthens Fides Energy's renewable energy investments.

The electricity produced in our power plant is certified to international standards in line with environmental sustainability principles and contributes to the reduction of carbon emissions.

As Fides Energy, we continue to utilize our domestic water resources with high efficiency and nature-friendly engineering solutions.

Featured Technological Infrastructure

Modern River Type HEPP Commissioned in 2021
12.4 MW High Capacity Generation Infrastructure
Green Energy Certification at International Standards
24/7 SCADA Automation and Carbon Emission Reduction

Get Instant Invoice Analysis & Offer with Online Operations!

Upload your last 3 monthly invoices online or fill out the offer form, our expert team will prepare your savings options within 24 hours.

Online Operations